Waste Water Treatment Facility
Acton, MA
Summer, 2025
Conventional Structure
Building dimensions —28’-0" width x 67'-4" length x 28'-6" height (1,885 sf). Primary structure as sized on structural drawings including beams, columns, bracing, angles, plates, and connections.
Wide Flanges, angles and plates Gr 50.
WF beams and columns Gr 50.
1.5-B Deck 18Ga roof deck galvanized
Perimeter angle
Connections
Wall panels are concealed fastened MBCI MasterLine 16 24 Gauge Kynar finish
Insulated translucent wall panels 4” thickness
Anchor bolts and templates


Tolleson, AZ
Fall, 2024
Conventional Steel
Primary structure for the mezzanine area including WF sections, HSS section, joist, angles,
deck and connections
Wide Flange and Angles Gr 50
Floor bar Joist K-series
1.5-B Deck 24 Ga floor deck galvanized
Perimeter angles
IV provided approval drawings, final detailing, shop drawings, TEKLA model and construction drawings.
Total project is 60,000 square-foot facility located on 12 acres with 26 service bays, a 24,000 square foot parts warehouse, a state-of-the-art showroom and office area, and electric charging capabilities.
Vanguard Truck Center


Hanger 1
Ocala, FL
Spring, 2022
360’‐0” W x 60’‐0” L x 20’‐0” H (1:12) Pre‐Engineered Metal Building including frames, secondary structure, roof and wall panels. Bay spacing is 3 @ 20’‐0”
Frames are CB‐5 with 5 interior columns spaced every 60’‐0”
End frames are non‐expandable. Both EW are half load rigid frames CB‐5. Left EW is designed for actual hangar doors; Right EW is designed to support future hangar doors same as Left EW.
Secondary structure is 10” depth Zee purlins.
Roof Panels are Trapezoidal SSR 24ga
Wall panels are PBR 26ga
Left EW is designed to support (6) 55’‐0” x 16’‐0” hydraulic doors
Structural steel framing manufactured by International Ventures’ partner Integra.


Gila Bend Aux Airfield
Maricopa Co, AZ
Summer, 2024
Project Specs: Updated air field lighting building.
Completed structural steel for metal building and all connections.
Plus provided Standing Seam Metal Roof panels
AIS certified facility
Detailing services provided approval drawings, shop drawings, and construction drawings.
Zero change orders.
On budget, no change orders.
No delays.

Wedding Venue
Apache Junction, AZ
Project Completed Fall, 2023
Project Specs:
Chapel: Straight column clear span or modular frame steel building system 41’-0” wide x 75’-0” long x 14’-0” eave height.
Non-expendable end wall frames. 6:12 roof slope. Bypass Girts at sidewalls and at end walls. Bay Spacing’s are 4 @ 18’-9”.
Event Center: Straight column clear span or modular frame steel building system 56’-0” wide x 100’-0” long x 14’-0” eave height. Non-expendable end wall frames. 6:12 roof slope. Bypass Girts at sidewalls and at end walls. Bay Spacing’s are 4 @ 18’-9”. With a 15’ x 50’ x 10’-6” Single sloped building attached to the side wall of the event center. 3/12 roof slope.
Structural steel framing manufactured by International Ventures’ partner Integra.


Sports Complex
Leetsdale, PA
Project Completed Fall, 2023
Project Specs:
Pre-Engineered Metal Building: 200’-0” W x 450’-0” L x 32’-0” Eave Ht.
Metal Frames, purlins, girts, roof and wall panels, trim. Bay spacing is 18@25’-0” Roof secondary structure is ‘Zee’ purlin 10” depth. Wall secondary structure is ‘Zee’ girts 8” depth.
Roof panels-24” wide Trapezoidal SSR 24Ga Galvalume. Wall panels PBR 26 Ga painted Silicone Polyester finish.
Flashings and trim. Gutters and downspouts. All installation/erection hardware (bolts, nuts, washers). Framed openings for (1) 12’-0” x 12’-0” overhead door, (13) 3’-0” x 7’-0” walk doors, (1) 6’-0” x 7’-0” walk doors, (1) 17’-2”x 8’-0” + (1) 15’-0” x 8’-0” store-front doors. Projection canopy on the corner of left endwall and back sidewall.
Screenwalls installed.
Structural steel framing manufactured by IV partner Integra.


AZ Corp Builders
Tempe, AZ
Project Delivered June, 2022
Project Specs:
Single Slope 40’W x 155’ L x 30’/33’ Ht
Pre-engineered metal building including frames, secondary structure, roof and wall panels and trim. Clear span interior frames.
-
Roof panels PBR 22ga painted Kynar finish
-
Wall panels PBR 22ga painted Kynar finish
International Ventures provided engineering, design and materials from our manufacturing partner Integra.
Project completed on-time and on-budget


Building 300
Imperial, PA.
Completed Spring, 2023
Building Project
Approx 100,000 sq. feet
Conventional structure with concrete tilt ups. International Ventures provided the joist girders, open web still joists, angles, and connections.
Faced no delivery nor construction issues. On budget and zero change orders.


Sound Wall
Middleboro, MA
Completed Fall, 2021
Highly technical and specific project. Highly complex engineering. Enclosure for town’s generator. Hot-dipped galvanized structure. Specialty sound-wall panels.
Price held through market industry price increases.


Jumboair Arena
Ocala, FL
Completed 2022
Pre-engineered metal building including frames
& secondary structure
100’W x 200’ L x 20’ H
Steel framing manufactured by Integra in Mexico


Bimbo Bakery
Leetsdale, PA.
Completed 05/2020
Building Project
20,000 sq. feet
Pre-Engineered Metal Building
Clear span frame
End frames-non-expandable rigid frames
Roof panels SSR 24ga Galvalume
Wall panels PBR 26ga painted
Framed opening for overhead doors, walk doors and windows
R26 roof insulation
R19 MBI Blanket insulation on walls
International Ventures supplied the entire package of structural steel framing, and roof and wall panels using a combination of preferred suppliers.
Project completed on-time and on-budget.
Bimbo Bakery
Leetsdale, PA.
Completed 05/2020
Building Project
20,000 sq. feet
Pre-Engineered Metal Building
Clear span frame
End frames-non-expandable rigid frames
Roof panels SSR 24ga Galvalume
Wall panels PBR 26ga painted
Framed opening for overhead doors, walk doors and windows
R26 roof insulation
R19 MBI Blanket insulation on walls
International Ventures supplied the entire package of structural steel framing, and roof and wall panels using a combination of preferred suppliers.
Project completed on-time and on-budget.


DPW
Yarmouth, MA
Completed 05/2021
Six Building Project
40,000 sq feet & 350 tons steel.
-
PEMB primary framing, secondary framing, mezzanine, canopy, roof & wall panel systems
-
Hot dip galvanized coating on frames
-
Secondary framing G90 finish
-
SSR 24GA System
-
IMP Wall System to include Gutters & Downspouts
-
All framed openings for OHD, walk door & windows
-
Aluminum roof curbs, roof hatch assembly & safety rail per plans and specs
-
Color Guard snow guard system
-
R-40 Energy Saver Insulation
-
Certified Fall Protection System
-
Freight for ALL Materials delivered to job site


Christ Greenfield Gym
Gilbert, AZ
In Progress, Fall, 2023
Conventional & Miscellaneous Steel Packages for Janitor/Storage and Lobby area (20’-0” x 81’-0”)
Primary structure as sized on structural drawings including wide flange sections, HSS sections, angles, plates, and connections and roof deck.
WF beams and columns Gr 50.
HSS beams and columns Gr B.
1.5-B Deck 22 Ga, Galvanized roof deck
Perimeter angle
Connections
All installation/erection hardware.


Gulfstream at Skybridge
Mesa, AZ
Completed Fall, 2023
Conventional Structure.
WF beams and columns Gr 50.
HSS beams and columns Gr B.
Support Beams for (4) new HVAC including 3 Plate Beams, connection plates.
Fall Arrest Supports Systems for (3) Hangar Bays including Stub columns, Angle bracing, HSS
members and connections.
Structural steel framing and deck manufactured by IV partner Integra
All installation/erection hardware.